Ak Zhol Kurylys LLP — road construction and infrastructure modernization
Comprehensive solutions for road infrastructure development
of roads constructed
2300
км
With an experienced team, modern laboratories, and in-house production resources, Ak Zhol Kurylys ensures efficient delivery of road projects — from concept to operation.
A full range of road works — from design and site preparation to construction, reconstruction, and operation of highways
We lay asphalt or cement concrete using modern technologies, ensuring smoothness, strength, and durability.
Road Surface
We create a strong earth base by performing excavation, embankment, soil stabilization, and compaction.
Earthworks & Ground Preparation
We clear the site, relocate utilities, and create safe conditions for the start of construction
Site Preparation
We create a strong earth base by performing excavation, embankment, soil stabilization, and compaction.
Road Base
We conduct final quality control, hand over the facility, and provide ongoing maintenance.
Commissioning
We install curbs, road signs, and barriers, and apply road markings — creating a safe and convenient road infrastructure.
Landscaping and Safety
We construct drainage systems, stormwater drainage, lighting, and utilities that protect the road from premature deterioration.
Engineering Systems
We deliver engineering surveys, geological and geodetic studies, and precise project design in full compliance with industry standards.
Analysis and Design
News
11. Construction of a road within the project “Construction of a seawater desalination plant” (Mangystau region, Tokymak area), including engineering infrastructure;
14. Reconstruction of Mangystau railway station.
13. Reconstruction of km 43–132 of the “Aktau–Fort-Shevchenko” road (Phase 1: km 43–73);
12. Construction of a street and road network in Orazak village, Tselinograd district, Akmola region;
8. Reconstruction of a 5 km road in Aktau from the Special PSC to the Nuras gas station;
10. Medium repair of the access road to Khan Ordasy village, km 0–11 and 11–21;
9. Major overhaul of km 50–103 of the republican road “Unige–Bisen–Saykhin”;
6. Reconstruction of the road from the MAEK water intake facility to the Port of Kuryk (Phase II, adjusted);
5. Construction of the northern bypass road of Atyrau (Atyrau bypass);
4. Reconstruction of km 5–43 of the “Aktau–Fort-Shevchenko” road (Phase 1: km 5–29), with design adjustments;
3. Construction of the Kuryk bypass and major overhaul of km 0–40 of the A-36 “Kuryk–Zhetybay” road;
2. Reconstruction of a 10 km road in Baskuduk village, Mangystau region, including bridge reconstruction;
1. Reconstruction of km 616–648 of the A-27 “Aktobe–Atyrau–Russian Federation border (to Astrakhan)” republican highway (Lot 1, new);
Completed Projects
Ongoing Construction Projects
17. Reconstruction of the runway, taxiways, and apron at the Aktau International Airport;
15. Construction of an overpass (km 55), construction of a sand base, and major repair of the A-36 Kuryk-Zhetybai highway section, km 40-64;
14. Construction of residential buildings in the 4th sector of Arys city, Turkestan region;
13. Major repair works of residential buildings in the 4th sector of Arys city, Turkestan region;
12. Reconstruction of the road from the MAEK water intake to the Kuryk seaport. Construction of a bridge across the Shora spillway channel;
11. Reconstruction of the Kiyakty-Tushchykudyk highway;
10. Reconstruction of the highway from the Honda center to the T-junction of Umirzak village in Aktau, 4.5 km long. Adjustment;
5. Construction of a 100-apartment dormitory in Aktau;
9. Construction of a pedestrian bridge over the railway tracks at the Sai-Utes station, Mangystau district, Mangystau region;
8. Reconstruction of the Aktobe - Orsk highway, section 8-16 km;
7. Reconstruction of the highway from the MAEK water intake to the Kuryk seaport in Aktau, Mangystau region. Sections 1 and 2;
6. Construction of residential buildings in 31 "A" microdistrict, plot 7/1;
4. Construction of military unit No. 51809, technical position, located in Beyneu village, Mangystau region;
3. Construction of a military training ground in the Kyzylkum area, Munaily district, Mangystau region;
2. Major repair of the Aktau-Kalamkas road (section 43-75 km) to Fort-Shevchenko - 43 km;
1. Reconstruction of the Zhetybai-Zhanaozen highway section, Lot 1, km 0-35 (including runway);
7. Reconstruction of a 6.2 km road from the KhGMZ railway crossing to checkpoint No.17;
16. Medium repair of KR-2 "43 km of Aktau-Fort-Shevchenko-Kalamkas highways", km 183-212, km 212-241;
Aq Zhol Qurylys is your qualified and reliable partner. Our team offers a comprehensive range of services, including design, construction, reconstruction, and operation of facilities for various purposes.
We will consult you, select the best solutions, and ensure reliability. Leave your contact details, and we will get back to you shortly.
НАШИ КОНТАКТЫ
Our Contacts
Monday - Friday, 09:00 - 18:00
Business Hours:
Aktau, Mangystau Region, Industrial Zone 9 / Plot 43
Address:
7292 203499, info_azhk@azhkgroup.kz
Phone and email:
All rights reserved | © 2026 Akzhol Kurylys
Top News
Useful Links
QUICK LINKS
We are on social